Waltham Point, Waltham Abbey
Waltham Abbey
Construction of a 600m by 100m double truss steel construction distribution warehouse for Sainsbury’s. Works include major earthworks cut and fill grading, Soil stabilisation of 20 hectares, CFA piling, contiguous piled retaining wall, Gabion retaining wall, reinforced earth retaining wall, structural steel frame, roof and wall cladding, drainage works, underground services, fibre reinforced internal concrete slabs, air entrained external concrete slabs and pre-cast concrete dock levellers.
Construction of a 600m by 100m double truss steel construction distribution warehouse for Sainsbury’s. Works include major earthworks cut and fill grading, Soil stabilisation of 20 hectares, CFA piling, contiguous piled retaining wall, Gabion retaining wall, reinforced earth retaining wall, structural steel frame, roof and wall cladding, drainage works, underground services, fibre reinforced internal concrete slabs, air entrained external concrete slabs and pre-cast concrete dock levellers.
Project Details
- ClientKIER
- Value£30.00M
- CompletedSeptember 2002
- ServicesIndustrial
- StatusCompleted
Explore Other Projects

Premier Inn Hotel, London
Design and construction of a six storey, 95 bedroom hotel for Premier Inn. City ...
View Details →
St Vincents House, Ipswich
Refurbishment of an existing 11 storey office building to CAT A....
View Details →
County House: Beckenham
Conversion of existing 6 storey building to 75 residential apartments. Works inc...
View Details →