Premier Inn Hotel, London
London
Design and construction of a six storey, 95 bedroom hotel for Premier Inn. City centre development in North London. Piled basement RC frame to first floor podium deck, lightweight metal frame (Metsec) for the main structure with composite concrete floors. Curtain wall to ground floor and upper floor floors. Facades consist of insulated render system. Building topped with green roof. BREEAM (2011) Very Good building and EPC A grade achieved.
Design and construction of a six storey, 95 bedroom hotel for Premier Inn. City centre development in North London. Piled basement RC frame to first floor podium deck, lightweight metal frame (Metsec) for the main structure with composite concrete floors. Curtain wall to ground floor and upper floor floors. Facades consist of insulated render system. Building topped with green roof. BREEAM (2011) Very Good building and EPC A grade achieved.
Project Details
- ClientKIER
- Value
- CompletedFebruary 2011
- ServicesLeisure
- StatusCompleted
Explore Other Projects

Gloucester Business Park, Gloucester
Major civil engineering project that included a link road, underpass, bridge and...
View Details →
Links Medical Practice
Construction of a new extension building to increase capacity of the existing me...
View Details →
Ashford Warehouse
Construction of 3000m2 warehouse together with 1.5hectares of external lorry par...
View Details →